Image

A world first: 5-storey hotel made of PEFC-certified timber opened in Austria

The vision to build a hotel entirely of wood has become a reality in the 5* Green Spa Hotel MalisGarten. The hotel opened in June in the Zillertal valley in Austria.

MalisGarten is the world’s first 5-storey hotel made entirely of solid wood. 

PEFC-certified glue laminated timber (binderholz glulam) and cross laminated timber (binderholz CLT BBS) supplied by Binderholz Bausysteme GmbH were used for the entire supporting structure.

The inside of the building sees binderholz solid wood panels and profiled wood from native trees such as pine, nut, steamed spruce, larch and white fir. 

The doors, furniture and parquet floors are made of walnut and oak wood from local producers.

Wood was also used for the furniture and decoration in the hotel’s spacious lobby, and gives the rooms a warm atmosphere as well as a natural scent.

The Italian star architect Matteo Thun from Matteo Thun & Partners who planned MalisGarten especially appreciates the material’s unique versatility.

“Wood is the only material I know of that combines aesthetics and technical durability,” he highlighted.

Extraordinary inside and out

Not only the inside, also the building’s wooden exterior façade is eye-catching. The front of the hotel blends in with its garden, creating a natural oasis in the middle of the village.

At the back of the hotel, there is a 2,000 m² space with relaxation areas, a fruit and herb garden and a large pool. The wooden walls and ceilings give the impression of a wellness landscape in the middle of a forest.

Sustainability at its finest

The use of PEFC-certified solid wood and a sophisticated heating and cooling concept using geothermal energy and pellet heating make MalisGarten one of the most sustainable hotels in the area.

Thanks to the use of wood, the hotel has a larger net usable area due to leaner construction, and lower energy costs due to the wood’s natural insulation properties.

Wood stores CO2 throughout its life cycle. In MalisGarten, more than 1,500 tons of CO2 are stored in the solid wood elements. Solid wood structures can be prefabricated and assembled on site, allowing for a quiet, clean and fast construction.

Woods such as fir, spruce or pine give a room a warm atmosphere and have a calming effect on the mind and body, making wood the perfect material in every respect for Green Spa Hotel MalisGarten.

Facts

Builder: Family Binder-Egger | ZillerSeasons
Architecture: Matteo Thun Milano, Meissl Architects
Statics: Binderholz Bausysteme GmbH
Support structure planning: tragwerkspartner zt GmbH
Wood construction: Holzbau Schweinberger GmbH
Products used: binderholz CLT BBS, glulam, 3-layer solid wood panels and profiled timber

Source: PEFC

Latest Posts

Image
6 October 2026

Building a timber trampoline in the sky!

The Pringle at Assembly Studios near Atlanta is an 82-foot clear-span, 4,000-square-foot bending-active timber gridshell. Its two-layer roof was assembled flat from straight 3-by-3-inch timber laths, lifted in a single...
Read More
Image
6 October 2026

Mass timber solution to Canada’s housing crisis

New study from Perkins&Will offers mass timber solution to Canada’s housing crisis — researchers propose a prefabricated, modular mass-timber system for accelerating housing delivery while supporting the nation’s economy and...
Read More
Image
6 October 2026

Waikato Regional Theatre case study

The Waikato Regional Theatre is an arts-led regeneration project intended to create a civic and cultural hub on Hamilton’s riverfront. Designed as a community and visitor destination, it will combine...
Read More
Image
29 September 2026

Timber engineering of tomorrow

An airship hangar as a blueprint for the timber engineering of tomorrow: it is the gates that make the scale of this structure immediately comprehensible.  But the real highlight of...
Read More
Image
29 September 2026

Go the Swiss!

Bürogebäude Wood in Grenoble — The six-storey timber structure uses columns and beams spaced 4–6 m apart, supported on shallow concrete footings with tie-rods for seismic resistance; the eastern section...
Read More
Image
29 September 2026

EVE Music Hall — Croatia

This looks like an icon in the making – can’t wait to see the finished photos inside this magnificent space! The EVE Music Hall is set to become a new...
Read More
Image
29 September 2026

Albert Park Pit Building

Who doesn’t like civic buildings especially when they also serve as Grand Prix venues. Woods Bagot has been appointed to lead the architectural vision for the redevelopment of the Albert...
Read More
Image
22 September 2026

The Court Theatre – case study

The Court Theatre project is a purpose-built performing arts venue in Christchurch, designed to be the cultural heart of the city. The building integrates mass timber elements to enhance sustainability,...
Read More
Image
22 September 2026

Wood is Good Day at Te Hapara School

Hands-on Wood is Good Day gives students a glimpse into the people, technology and opportunities behind forestry. Te Hapara School students got up close to the world of forestry this...
Read More