Image

Australia’s First Mass-Engineered Timber Fire Station Officially Operational in Maryborough, QLD

More than six years and $14 million of works are complete at the Queensland Fire and Emergency Headquarters in the heritage city of Maryborough, but this is a building like no other.

The station is the first in Australia to be made of mass-engineered timber, and the irony is not lost on QFES Deputy Commissioner Mike Wassing.

“Normally, we’re fighting fires associated with timber,” he said.

“The fact that now our fire station is actually made of timber — there’s a lot of detail and research that has gone into that.”

The new design restored the 1951 heritage-valued brick bones of the original station, with the remainder of the building constructed from locally sourced wood.

Mass-engineered timber uses state-of-the-art technology to glue, nail or dowel wood products together in layers to make structural panels, posts and beams.

Click here to read on.

Latest Posts

Image
6 October 2026

Building a timber trampoline in the sky!

The Pringle at Assembly Studios near Atlanta is an 82-foot clear-span, 4,000-square-foot bending-active timber gridshell. Its two-layer roof was assembled flat from straight 3-by-3-inch timber laths, lifted in a single...
Read More
Image
6 October 2026

Mass timber solution to Canada’s housing crisis

New study from Perkins&Will offers mass timber solution to Canada’s housing crisis — researchers propose a prefabricated, modular mass-timber system for accelerating housing delivery while supporting the nation’s economy and...
Read More
Image
6 October 2026

Waikato Regional Theatre case study

The Waikato Regional Theatre is an arts-led regeneration project intended to create a civic and cultural hub on Hamilton’s riverfront. Designed as a community and visitor destination, it will combine...
Read More
Image
29 September 2026

Timber engineering of tomorrow

An airship hangar as a blueprint for the timber engineering of tomorrow: it is the gates that make the scale of this structure immediately comprehensible.  But the real highlight of...
Read More
Image
29 September 2026

Go the Swiss!

Bürogebäude Wood in Grenoble — The six-storey timber structure uses columns and beams spaced 4–6 m apart, supported on shallow concrete footings with tie-rods for seismic resistance; the eastern section...
Read More
Image
29 September 2026

EVE Music Hall — Croatia

This looks like an icon in the making – can’t wait to see the finished photos inside this magnificent space! The EVE Music Hall is set to become a new...
Read More
Image
29 September 2026

Albert Park Pit Building

Who doesn’t like civic buildings especially when they also serve as Grand Prix venues. Woods Bagot has been appointed to lead the architectural vision for the redevelopment of the Albert...
Read More
Image
22 September 2026

The Court Theatre – case study

The Court Theatre project is a purpose-built performing arts venue in Christchurch, designed to be the cultural heart of the city. The building integrates mass timber elements to enhance sustainability,...
Read More
Image
22 September 2026

Wood is Good Day at Te Hapara School

Hands-on Wood is Good Day gives students a glimpse into the people, technology and opportunities behind forestry. Te Hapara School students got up close to the world of forestry this...
Read More