Image

Brisbane: Kirk Creates “Experimental” Office Tower

Kirk has created an “experimental” office tower in Brisbane that thoughtfully navigates a complex brief, a challenging site and a tight timeframe by utilizing locally grown and manufactured CLT.

In 2018, munitions company Nioa reached out to Kirk with a request for a new office to accommodate its growing workforce. The company, which had secured a multi-million dollar Australian Defence Force contract in late 2017, was undergoing a period of significant expansion for which it needed more offices at its Brisbane location – and fast.

The tight timeline was only one of the complexities of this project. Its small site is constrained by high winds, height restrictions, noise from nearby Brisbane Airport and what Kirk described as “highly corrosive air”. Further, these challenges had to be met for a client and at a location relevant to national security.

Kirk responded to this complex brief by thinking of the project as a prototype that adopted a set of building systems: a timber structure, a glazed facade and a zinc skin. To create visual definition and interest, the raw timber throughout the interior would be treated with some clear and some dark finishes.

Click here to read more, and click here for even more!

Latest Posts

Image
3 November 2026

Prolam SED PLX Portal test

Farhad walks through our recent live structural test at Prolab, Prolam’s in-house testing facility, explaining the system, the test setup and what we learned. The test put our latest composite...
Read More
Image
3 November 2026

The Hive

If you work in mass timber – or drive around Vancouver – you’ve probably seen The Hive by now. So rather than introducing the project again, here is one pretty...
Read More
Image
3 November 2026

Wharerama pod

Sheppard & Rout designed this amazing place of healing at St Thomas College! Incredible inspiring vision from the Gibbons family, beautifully built by Armitage Williams with help from Naylor Love...
Read More
Image
27 October 2026

SPEC Toolbox 3.0

Just released — SPEC Toolbox 3.0, the biggest release since we started as CLT Toolbox. Thousands of structural engineers use the platform to design mass timber, free, with real supplier...
Read More
Image
27 October 2026

Te Ao Mārama Tauranga Library and Community Hub

Recently, Te Ao Mārama Tauranga Library and Community Hub officially opened its doors to the public, marking an exciting milestone as the first building within the Te Manawataki o Te...
Read More
Image
27 October 2026

Mass Timber Diaphragms for Tall Buildings

Practical Design Guidance for Tall Timber and Hybrid Buildings As building codes continue to enable taller mass timber construction across Canada, engineers and designers are seeking practical approaches to designing...
Read More
Image
27 October 2026

Henryk Arctowski Antarctic Station uses timber prefabrication

Harsh weather, limited operational windows and complex logistics: how timber prefabrication and teamwork made the new Polish Henryk Arctowski Antarctic Station possible. How far can timber prefabrication go? All the...
Read More
Image
3 November 2026

Fast & Epp’s concept lab introduces Glulam CLT (GCLT)

Have you ever felt the face-grain expression of softwood CLT lacks the refined look of an edge grain profile? Ever wanted sharper kerf edges or acoustic attenuation in a CLT...
Read More
Image
20 October 2026

Moisture management of mass timber buildings

CWC Handbook for Construction Moisture Management of Mass Timber Buildings Moisture management doesn’t begin when rain appears in the forecast. It begins during project planning and continues through construction, commissioning,...
Read More