Image

Concrete industry moving to decarbonise

Industry comes together for roadmap towards net zero-emissions in concrete & cement

[LONDON] Major concrete companies and cement plants, including Heidelberg, Cemex and Holcim, join architects, engineers, and construction firms in a collective acknowledgement for action. Mission Possible Partnership (MPP) have developed the new strategy with industry input, setting out milestones and commitments needed by government, industry and investors over the next 25 years to make net zero emissions concrete and cement a reality.

  • First strategy developed with concrete & cement industry & anchored in granular economic modelling
  • Three main levers to enable net zero by 2050 and stay within the sectoral 1.5°C carbon budget
  • High cost increase for production, but typical building increase limited to 3%

Concrete is the world’s most widely used material after water, and with cement, it is an essential part of the global economy, critical to buildings, transportation, and other infrastructure. The sector currently generates 8% of global CO2 emissions: more than aviation and shipping combined. The challenge of increasing emissions is becoming more urgent as production of concrete and cement is increasing to meet global needs. Without efficiency gains, demand for cement is projected to increase by 50% by 2050.

‘Making Net Zero Concrete and Cement Possible’ shows, through its Net Zero scenario, how the sector can reach net zero GHG emissions and comply with a 1.5°C target if urgent action is taken across all three levers:

  • 22% emissions reduction can be achieved on the demand side through efficiency improvements in construction and design reducing the volume of concrete needed without compromising safety or durability.
  • 25% reduction can be achieved in process emissions on the supply side by deploying Supplementary Cementing Materials (SCMs) to decrease the use of clinker; whilst bringing alternative chemistries to commercial stage.
  • 53% of emissions can be reduced, eliminated or captured through a combination of fuel switch, power sector decarbonisation and carbon capture utilisation and storage (CCUS).

Click here for the full story (Mission Possible Partnership)

Latest Posts

Image
29 September 2026

Timber engineering of tomorrow

An airship hangar as a blueprint for the timber engineering of tomorrow: it is the gates that make the scale of this structure immediately comprehensible.  But the real highlight of...
Read More
Image
29 September 2026

Go the Swiss!

Bürogebäude Wood in Grenoble — The six-storey timber structure uses columns and beams spaced 4–6 m apart, supported on shallow concrete footings with tie-rods for seismic resistance; the eastern section...
Read More
Image
29 September 2026

EVE Music Hall — Croatia

This looks like an icon in the making – can’t wait to see the finished photos inside this magnificent space! The EVE Music Hall is set to become a new...
Read More
Image
29 September 2026

Albert Park Pit Building

Who doesn’t like civic buildings especially when they also serve as Grand Prix venues. Woods Bagot has been appointed to lead the architectural vision for the redevelopment of the Albert...
Read More
Image
22 September 2026

The Court Theatre – case study

The Court Theatre project is a purpose-built performing arts venue in Christchurch, designed to be the cultural heart of the city. The building integrates mass timber elements to enhance sustainability,...
Read More
Image
22 September 2026

Wood is Good Day at Te Hapara School

Hands-on Wood is Good Day gives students a glimpse into the people, technology and opportunities behind forestry. Te Hapara School students got up close to the world of forestry this...
Read More
Image
22 September 2026

Beyond the borders

When you look beyond our borders for where mass timber is gaining traction it’s often in education buildings. Maybe it’s because young people getting educated are a natural fit for...
Read More
Image
22 September 2026

Opening of Poutini Waiora

The opening of Poutini Waiora in Māwhera Greymouth celebrated a new facility designed to provide more comprehensive support for whānau and the wider West Coast community. The occasion also honoured...
Read More
Image
15 September 2026

Atlassian Central — the last panel is now in place!

The last timber panel is now in place at Atlassian Central, the final piece in a global milestone for the world’s tallest hybrid timber tower.  Also check out the great...
Read More