
When Dallas architect Jeff Guning enlisted Sean Guess of Austin’s Faye + Walker Architecture for his two-phased retirement home, the duo chose high-quality natural materials, exposed wood, and light-frame construction for a resilient, enduring design. The result is a meticulously crafted and timeless residence overlooking Texas Hill Country that was on budget and will continue to serve its owners, and their adult children, well into their golden years.
In recent years, trends like slow living, slow eating, and slow fashion have gained notable traction for their long-term sustainable benefits. Faye + Walker’s thoughtfully designed, budget-friendly Tree House—a multi-level family home and guest quarters built in stages over five years—might just inspire you to add slow architecture to that list.
Constructing this project over two phases—and slowing things down as a result—made perfect sense given his client’s need to work within a budget while transitioning into retirement and desire to accommodate intergenerational living, explains Guess, Faye + Walker’s founder.
Perched above Lake Travis in Jonestown, Texas—about 20 miles northwest of Austin—the resulting three-volume, multi-level home takes full advantage of its idyllic 5.7-acre site. Surrounded by a small grove of serpentine oak trees, the home’s expansive glazing takes in Hill Country and lake views to the north, with a dense forest to the south.
The 3,200-square-foot residence comprises 1,000 square feet of guest quarters (completed in phase one) and a 2,200-square-foot primary residence (completed in phase two). The phased strategy provided the family with a weekend retreat as they finalized the design of and constructed the main house.
Another advantage? “Spreading the cost over five years helped us work within a specific budget,” Guess says. “At the same time, having the time to live with the first phase and really understand how they wanted to connect with the landscape improved the design of phase two in ways that wouldn’t have been possible with a rushed timeline.”
Click here to read more.
Latest Posts

Prolam SED PLX Portal test

The Hive

Wharerama pod

SPEC Toolbox 3.0

Te Ao Mārama Tauranga Library and Community Hub

Mass Timber Diaphragms for Tall Buildings

Henryk Arctowski Antarctic Station uses timber prefabrication

Fast & Epp’s concept lab introduces Glulam CLT (GCLT)

