Image

Goldsmith Street and Beyond: Mikhail Riches’ Award-Winning Timber-Frame Housing

Although Mikhail Riches‘ catalogue of timber projects dates back to Clay Field in Suffolk in 2009 – built with timber frame, lime-based insulation and shingle cladding – it was their social housing development Goldsmith Street that really consolidated the practice’s agenda to build with low carbon materials such as timber.

The rows of terraced houses on Goldsmith Street are bookended by low-rise flats; image © Tim Crocker.

Trailblazing timber social housing

Completed in 2019 and providing 93 sustainable homes for social rent in the heart of Norwich, Goldsmith Street has become a national exemplar of timber frame housing built at scale. With seven terrace blocks neatly arranged into four rows, the development provides a combination of family-sized houses and low-rise flats – all built to rigorous Passivhaus standards.

As the first new social housing development undertaken by Norwich City Council in 20 years, it was important to the council that the scheme aim for high quality as well as quantity.

The existing city-centre site comprised low-density sheltered housing that no longer met modern standards. Wanting to increase provision of much-needed, good quality homes – that would alleviate fuel poverty as well as housing need – the council ran a RIBA competition with a brief requiring a mixture of houses and flats. They also wanted to see innovative ways to provide public and private amenity space to enrich the lives of inhabitants and foster a sense of community.

Mikhail Riches developed a winning proposal based on a Victorian terraced community.

With tightly arranged but well-proportioned houses, inward-facing back gardens and pedestrian-friendly streets, their design allowed for increased development on the site, while maintaining good spacing between buildings.

From their early design plans, the architects carefully laid out the terraces with a southerly orientation, excellent form factor and sloped roofs that would maximise daylight. By embedding their solar strategy into the masterplan, they were able to adapt their initial design with minor amendments to target full Passivhaus accreditation at the council’s request.

Click here to read more.

Latest Posts

Image
29 September 2026

Timber engineering of tomorrow

An airship hangar as a blueprint for the timber engineering of tomorrow: it is the gates that make the scale of this structure immediately comprehensible.  But the real highlight of...
Read More
Image
29 September 2026

Go the Swiss!

Bürogebäude Wood in Grenoble — The six-storey timber structure uses columns and beams spaced 4–6 m apart, supported on shallow concrete footings with tie-rods for seismic resistance; the eastern section...
Read More
Image
29 September 2026

EVE Music Hall — Croatia

This looks like an icon in the making – can’t wait to see the finished photos inside this magnificent space! The EVE Music Hall is set to become a new...
Read More
Image
29 September 2026

Albert Park Pit Building

Who doesn’t like civic buildings especially when they also serve as Grand Prix venues. Woods Bagot has been appointed to lead the architectural vision for the redevelopment of the Albert...
Read More
Image
22 September 2026

The Court Theatre – case study

The Court Theatre project is a purpose-built performing arts venue in Christchurch, designed to be the cultural heart of the city. The building integrates mass timber elements to enhance sustainability,...
Read More
Image
22 September 2026

Wood is Good Day at Te Hapara School

Hands-on Wood is Good Day gives students a glimpse into the people, technology and opportunities behind forestry. Te Hapara School students got up close to the world of forestry this...
Read More
Image
22 September 2026

Beyond the borders

When you look beyond our borders for where mass timber is gaining traction it’s often in education buildings. Maybe it’s because young people getting educated are a natural fit for...
Read More
Image
22 September 2026

Opening of Poutini Waiora

The opening of Poutini Waiora in Māwhera Greymouth celebrated a new facility designed to provide more comprehensive support for whānau and the wider West Coast community. The occasion also honoured...
Read More
Image
15 September 2026

Atlassian Central — the last panel is now in place!

The last timber panel is now in place at Atlassian Central, the final piece in a global milestone for the world’s tallest hybrid timber tower.  Also check out the great...
Read More