Image

Hines Breaks Ground on Melbourne’s Tallest Timber Tower

US real estate firm Hines will break ground on Melbourne’s tallest mass-engineered timber office building later this year after pausing plans for the $200-million project last year. The 15-level office project, dubbed Wellington, secured development approval late last year and other regulatory hurdles more recently, putting construction back on track to begin in the third quarter of this year. 

Hines director Simon Nasa said it had planned to begin construction last year, but put the project on hold to rethink its design and amenity as the pandemic hit. Hines remains committed to developing the building using its “T3 strategy”, employing timber benefiting from new transit and technology systems.

“Timber construction increases staff connection to their workplace, creating an enjoyable working environment which will appeal to forward-thinking tenants seeking a true ‘live, work, play’ balance for their staff,” Nasa said. “We are all about creating collaborative and adaptive workspaces that respond to the changing needs of progressive businesses, blurring the boundaries of what an office can do.”

Myerscough said the timber building and its sustainability credentials would appeal to and draw “young, dynamic tenants” in the technology, marketing, professional services, design and medical sectors looking to be on the cafe- and restaurant-lined Collingwood boulevards.

More >>

Latest Posts

Image
3 November 2026

Prolam SED PLX Portal test

Farhad walks through our recent live structural test at Prolab, Prolam’s in-house testing facility, explaining the system, the test setup and what we learned. The test put our latest composite...
Read More
Image
3 November 2026

The Hive

If you work in mass timber – or drive around Vancouver – you’ve probably seen The Hive by now. So rather than introducing the project again, here is one pretty...
Read More
Image
3 November 2026

Wharerama pod

Sheppard & Rout designed this amazing place of healing at St Thomas College! Incredible inspiring vision from the Gibbons family, beautifully built by Armitage Williams with help from Naylor Love...
Read More
Image
27 October 2026

SPEC Toolbox 3.0

Just released — SPEC Toolbox 3.0, the biggest release since we started as CLT Toolbox. Thousands of structural engineers use the platform to design mass timber, free, with real supplier...
Read More
Image
27 October 2026

Te Ao Mārama Tauranga Library and Community Hub

Recently, Te Ao Mārama Tauranga Library and Community Hub officially opened its doors to the public, marking an exciting milestone as the first building within the Te Manawataki o Te...
Read More
Image
27 October 2026

Mass Timber Diaphragms for Tall Buildings

Practical Design Guidance for Tall Timber and Hybrid Buildings As building codes continue to enable taller mass timber construction across Canada, engineers and designers are seeking practical approaches to designing...
Read More
Image
27 October 2026

Henryk Arctowski Antarctic Station uses timber prefabrication

Harsh weather, limited operational windows and complex logistics: how timber prefabrication and teamwork made the new Polish Henryk Arctowski Antarctic Station possible. How far can timber prefabrication go? All the...
Read More
Image
3 November 2026

Fast & Epp’s concept lab introduces Glulam CLT (GCLT)

Have you ever felt the face-grain expression of softwood CLT lacks the refined look of an edge grain profile? Ever wanted sharper kerf edges or acoustic attenuation in a CLT...
Read More
Image
20 October 2026

Moisture management of mass timber buildings

CWC Handbook for Construction Moisture Management of Mass Timber Buildings Moisture management doesn’t begin when rain appears in the forecast. It begins during project planning and continues through construction, commissioning,...
Read More