Image

Hotel Reschenhof, Mils | Austria

Once a quaint village inn, nowadays a beautiful 4* hotel. Reschenhof in Mils, not far from the Tyrolean capital Innsbruck, features a special combination of tradition and modernity. The recently implemented building extension with new garden suites, a large wellness area and two event halls in sustainable solid wood construction convinces with a natural feel-good atmosphere.

Facts

Project New construction of the 4* hotel Reschenhof
Ort Mils, Austria
Construction 2016
Builder Günter Oberhofer
Architecture Madritsch Pfurtscheller
Statics WA Ingenieure Wibmer + Aigner
Execution Schafferer Holzbau GmbH
Usable area 4,600 m²
Material use 340 m³ binderholz CLT BBS

Wood as a building material is convincing

Building with solid wood is fast and creates an excellent indoor climate. The initial idea of executing the hotel extension as a wooden construction was put into practice, because the natural material wood convinced across the board. The construction time for the entire hotel extension was just under one year. The entire above-ground part of the new building was built in solid wood construction. A total of 340 m³ of binderholz CLT BBS was used for this purpose. Thereof, 86 m³ were CLT BBS XL wall elements in non-visible quality. The ceilings, the roof and the other walls are made of CLT BBS 125 elements, mostly in visible quality. Only the underground car park, the foundations and the emergency stairs have been built with reinforced concrete.

The execution

Parallel to the construction of the upstream underground car park with green roof, the assembly of the prefabricated CLT BBS elements was started. These only had to be set up and connected on site. Immediately thereafter followed the drywall and installation works as well as the installation of the floor-to-ceiling window elements. After completion of the glass façade, a loggia-like balcony construction was added in front of the suites. Since these are not connected to the building shell, the sound and fire protection requirements could be elegantly met in this way. In the main staircase, wave-shaped elements made of CLT BBS were installed for the decorative demarcation of the staircase. The part of the building in which the suites are housed has a grey larch wood facade, while an eternit façade with large glass elements surrounds the new event and wellness area.

Arrangement of the structures

The extension includes, among other things, the construction of the 3-storey hotel building. It contains a total of 36 new alpine-lifestyle garden suites, each 35 m² in size, a south-facing glass front and a loggia with a view of the Tux Alps. A 1-storey connecting construction, which is covered with cavity roof elements, connects directly to the main building. It includes the 300 m² wellness area with a transition to the garden as well as two new event halls on a total area of 230 m² and the required service facilities. Furthermore, the new underground car park offers 85 additional parking spaces.

The expansion plans of the hotel owners include a doubling of the suites with a large wellness area and swimming pool to be added in a future construction phase. For this purpose, the new building is supposed to be mirrored to the north and the reinforced concrete staircase currently used as an escape route will be used as a second stairwell.

Photo: © Retter Wolfgang, © Architekten Madritsch & Pfurtscheller/Schafferer Holzbau GmbH

Source: Binderholz

Latest Posts

Image
29 September 2026

Timber engineering of tomorrow

An airship hangar as a blueprint for the timber engineering of tomorrow: it is the gates that make the scale of this structure immediately comprehensible.  But the real highlight of...
Read More
Image
29 September 2026

Go the Swiss!

Bürogebäude Wood in Grenoble — The six-storey timber structure uses columns and beams spaced 4–6 m apart, supported on shallow concrete footings with tie-rods for seismic resistance; the eastern section...
Read More
Image
29 September 2026

EVE Music Hall — Croatia

This looks like an icon in the making – can’t wait to see the finished photos inside this magnificent space! The EVE Music Hall is set to become a new...
Read More
Image
29 September 2026

Albert Park Pit Building

Who doesn’t like civic buildings especially when they also serve as Grand Prix venues. Woods Bagot has been appointed to lead the architectural vision for the redevelopment of the Albert...
Read More
Image
22 September 2026

The Court Theatre – case study

The Court Theatre project is a purpose-built performing arts venue in Christchurch, designed to be the cultural heart of the city. The building integrates mass timber elements to enhance sustainability,...
Read More
Image
22 September 2026

Wood is Good Day at Te Hapara School

Hands-on Wood is Good Day gives students a glimpse into the people, technology and opportunities behind forestry. Te Hapara School students got up close to the world of forestry this...
Read More
Image
22 September 2026

Beyond the borders

When you look beyond our borders for where mass timber is gaining traction it’s often in education buildings. Maybe it’s because young people getting educated are a natural fit for...
Read More
Image
22 September 2026

Opening of Poutini Waiora

The opening of Poutini Waiora in Māwhera Greymouth celebrated a new facility designed to provide more comprehensive support for whānau and the wider West Coast community. The occasion also honoured...
Read More
Image
15 September 2026

Atlassian Central — the last panel is now in place!

The last timber panel is now in place at Atlassian Central, the final piece in a global milestone for the world’s tallest hybrid timber tower.  Also check out the great...
Read More