Image

Law Changes To Enable Faster Consenting, More Prefabs, Comes Into Force

Government Law Changes To Enable Faster Consenting, More Prefabs, Comes Into Force; from Hon Dr Megan Woods, Minister for Building and Construction.

BuiltReady scheme will streamline consenting for offsite manufacturers with fewer inspection requirements:

  • A strengthened CodeMark product certification will improve confidence in building product compliance with the Building Code, including offsite and prefab manufacturing products
  • Law changes that introduce a new voluntary certification scheme for modular component, or prefab, manufacturers, and strengthen New Zealand’s building product certification scheme have come into force today, Minister for Building and Construction and Housing, Megan Woods says.

“This Government’s top priority is to secure our economy for New Zealanders and to help our businesses thrive. That’s why we’re constantly looking at creating efficiencies to boost construction, reduce building costs, and generate less waste.”

“These schemes both enable faster consenting of quality assured homes and buildings. Greater use of prefab methods and products will help us to keep up momentum to deliver the homes New Zealand needs and bring costs down,” said Megan Woods.

The new BuiltReady scheme will allow offsite building manufacturers who meet certain requirements to become certified to sign off their own designs and/or construction. BuiltReady modular components will be deemed to comply with the Building Code.

“Homes made offsite benefit from lower building costs, experience less delays, and significantly produce less construction waste which we know is dominating our landfills in New Zealand. BuiltReady gives manufacturers the option of a streamlined consenting pathway specifically designed for their needs.

“The changes to CodeMark will provide assurance that those evaluating and certifying products are doing their jobs well. This will help to grow confidence and uptake in the scheme that creates consenting efficiencies for buildings that use innovative or higher-risk products,” Megan Woods said.

The law changes for the BuiltReady scheme and revised CodeMark scheme take effect today. The BuiltReady scheme will be open for applications from certification bodies in late 2022 and open for applications from manufacturers in 2023.

Latest Posts

Image
29 September 2026

Timber engineering of tomorrow

An airship hangar as a blueprint for the timber engineering of tomorrow: it is the gates that make the scale of this structure immediately comprehensible.  But the real highlight of...
Read More
Image
29 September 2026

Go the Swiss!

Bürogebäude Wood in Grenoble — The six-storey timber structure uses columns and beams spaced 4–6 m apart, supported on shallow concrete footings with tie-rods for seismic resistance; the eastern section...
Read More
Image
29 September 2026

EVE Music Hall — Croatia

This looks like an icon in the making – can’t wait to see the finished photos inside this magnificent space! The EVE Music Hall is set to become a new...
Read More
Image
29 September 2026

Albert Park Pit Building

Who doesn’t like civic buildings especially when they also serve as Grand Prix venues. Woods Bagot has been appointed to lead the architectural vision for the redevelopment of the Albert...
Read More
Image
22 September 2026

The Court Theatre – case study

The Court Theatre project is a purpose-built performing arts venue in Christchurch, designed to be the cultural heart of the city. The building integrates mass timber elements to enhance sustainability,...
Read More
Image
22 September 2026

Wood is Good Day at Te Hapara School

Hands-on Wood is Good Day gives students a glimpse into the people, technology and opportunities behind forestry. Te Hapara School students got up close to the world of forestry this...
Read More
Image
22 September 2026

Beyond the borders

When you look beyond our borders for where mass timber is gaining traction it’s often in education buildings. Maybe it’s because young people getting educated are a natural fit for...
Read More
Image
22 September 2026

Opening of Poutini Waiora

The opening of Poutini Waiora in Māwhera Greymouth celebrated a new facility designed to provide more comprehensive support for whānau and the wider West Coast community. The occasion also honoured...
Read More
Image
15 September 2026

Atlassian Central — the last panel is now in place!

The last timber panel is now in place at Atlassian Central, the final piece in a global milestone for the world’s tallest hybrid timber tower.  Also check out the great...
Read More