Image

Luggate Hall Replacement Revealed

Luggate locals were among the first to see a developed design of the permanent replacement for Luggate Memorial Hall at a stakeholders’ group meeting held today.

Community Association Chair Graeme Perkins said the Passive House standard design and panelised timber panel construction set the project apart from other community buildings around the country.

“This is potentially a first for New Zealand and certainly something about which the people of Luggate can feel very proud. We are a growing but very tight-knit community and having such an environmentally-sensitive building as the permanent replacement for the old hall will mean a lot for current and future residents,” he said.

The stakeholders’ group included members of the Luggate Community Association, local Councillors Calum MacLeod, Niamh Shaw and Quentin Smith, members of the project team, and Council staff.

Today also sees Council issue a Registration of Interest (ROI) from companies interested in tendering for the main construction contract. The ROI is specifically seeking companies with experience in constructing high performance and/or Passive House standard buildings. Full details are available on the GETS website here.

Shortlisted companies will be invited to submit a detailed response via a Request for Tender (RFT) process which is expected to begin in mid-October.

The project to build a permanent replacement for Luggate Memorial Hall reached a significant milestone last month with confirmation of funding grants totalling more than $1 million. Central Lakes Trust approved a grant of $750,000 while Otago Community Trust granted an additional $400,000.

QLDC Property Director Richard Pope said the new hall would not have been possible without community trust grants.

“I’d like to thank both the Central Lakes Trust and the Otago Community Trust for their financial support and I’m very much looking forward to the next stage of the project,” Mr Pope said.

Image Source: Queenstown Lakes District Council (concept drawing)

Latest Posts

Image
3 November 2026

Prolam SED PLX Portal test

Farhad walks through our recent live structural test at Prolab, Prolam’s in-house testing facility, explaining the system, the test setup and what we learned. The test put our latest composite...
Read More
Image
3 November 2026

The Hive

If you work in mass timber – or drive around Vancouver – you’ve probably seen The Hive by now. So rather than introducing the project again, here is one pretty...
Read More
Image
3 November 2026

Wharerama pod

Sheppard & Rout designed this amazing place of healing at St Thomas College! Incredible inspiring vision from the Gibbons family, beautifully built by Armitage Williams with help from Naylor Love...
Read More
Image
27 October 2026

SPEC Toolbox 3.0

Just released — SPEC Toolbox 3.0, the biggest release since we started as CLT Toolbox. Thousands of structural engineers use the platform to design mass timber, free, with real supplier...
Read More
Image
27 October 2026

Te Ao Mārama Tauranga Library and Community Hub

Recently, Te Ao Mārama Tauranga Library and Community Hub officially opened its doors to the public, marking an exciting milestone as the first building within the Te Manawataki o Te...
Read More
Image
27 October 2026

Mass Timber Diaphragms for Tall Buildings

Practical Design Guidance for Tall Timber and Hybrid Buildings As building codes continue to enable taller mass timber construction across Canada, engineers and designers are seeking practical approaches to designing...
Read More
Image
27 October 2026

Henryk Arctowski Antarctic Station uses timber prefabrication

Harsh weather, limited operational windows and complex logistics: how timber prefabrication and teamwork made the new Polish Henryk Arctowski Antarctic Station possible. How far can timber prefabrication go? All the...
Read More
Image
3 November 2026

Fast & Epp’s concept lab introduces Glulam CLT (GCLT)

Have you ever felt the face-grain expression of softwood CLT lacks the refined look of an edge grain profile? Ever wanted sharper kerf edges or acoustic attenuation in a CLT...
Read More
Image
20 October 2026

Moisture management of mass timber buildings

CWC Handbook for Construction Moisture Management of Mass Timber Buildings Moisture management doesn’t begin when rain appears in the forecast. It begins during project planning and continues through construction, commissioning,...
Read More