Image

Mass Timber Apartments Overcome Site Limitations

Alexan Access Apartments – The Alexan Access Apartments is a new 383-unit apartment complex just south of Alderwood Mall in Lynnwood, WA. Strouse Davis worked closely with the developers, a design team, and the City of Lynnwood to maximize density on a site that proved challenging due to an easement running through the center, poor soils, and the need for environmental mitigation.

The project is made up of two large 5-story structures and two smaller garden-style 3-story walk-ups. Amenities include two lounges, a rooftop deck, fitness center, BBQs, swimming pool and spa, outdoor sport court, and playground.

Details: Multi-Family (Apartments, Condos); MATERIAL TYPES: Glue-Laminated Timber (GLT or glulam), Structural Composite Lumber (eg LVL and LSL), I-joists

Click here to read more. 

Latest Posts

Image
3 November 2026

Prolam SED PLX Portal test

Farhad walks through our recent live structural test at Prolab, Prolam’s in-house testing facility, explaining the system, the test setup and what we learned. The test put our latest composite...
Read More
Image
3 November 2026

The Hive

If you work in mass timber – or drive around Vancouver – you’ve probably seen The Hive by now. So rather than introducing the project again, here is one pretty...
Read More
Image
3 November 2026

Wharerama pod

Sheppard & Rout designed this amazing place of healing at St Thomas College! Incredible inspiring vision from the Gibbons family, beautifully built by Armitage Williams with help from Naylor Love...
Read More
Image
27 October 2026

SPEC Toolbox 3.0

Just released — SPEC Toolbox 3.0, the biggest release since we started as CLT Toolbox. Thousands of structural engineers use the platform to design mass timber, free, with real supplier...
Read More
Image
27 October 2026

Te Ao Mārama Tauranga Library and Community Hub

Recently, Te Ao Mārama Tauranga Library and Community Hub officially opened its doors to the public, marking an exciting milestone as the first building within the Te Manawataki o Te...
Read More
Image
27 October 2026

Mass Timber Diaphragms for Tall Buildings

Practical Design Guidance for Tall Timber and Hybrid Buildings As building codes continue to enable taller mass timber construction across Canada, engineers and designers are seeking practical approaches to designing...
Read More
Image
27 October 2026

Henryk Arctowski Antarctic Station uses timber prefabrication

Harsh weather, limited operational windows and complex logistics: how timber prefabrication and teamwork made the new Polish Henryk Arctowski Antarctic Station possible. How far can timber prefabrication go? All the...
Read More
Image
3 November 2026

Fast & Epp’s concept lab introduces Glulam CLT (GCLT)

Have you ever felt the face-grain expression of softwood CLT lacks the refined look of an edge grain profile? Ever wanted sharper kerf edges or acoustic attenuation in a CLT...
Read More
Image
20 October 2026

Moisture management of mass timber buildings

CWC Handbook for Construction Moisture Management of Mass Timber Buildings Moisture management doesn’t begin when rain appears in the forecast. It begins during project planning and continues through construction, commissioning,...
Read More