Image

New WoodWorks Expert Tip: How to Create a Vertical Addition with Mass Timber

This detailed article examines the use of mass timber for vertical additions in the US, addressing topics such as code compliance, construction type, fire-resistance ratings (FRR), structural reinforcement, and constructability.

There is much discussion in the building design and development community about how to build a more sustainable future. Renovations and additions to existing structures have both cost and embodied carbon advantages over demolition and new construction. Designing an addition in wood can add to these benefits.

While ground-up construction is often necessary, vertical additions and adaptive re-use can be an attractive option—especially in urban areas with limited lot availability. Mass timber is a natural solution for these projects due to its enhanced aesthetics, ease of installation on tight urban sites, and relative light weight. Using mass timber can eliminate the need to reinforce the existing structure and/or foundation. This can significantly reduce costs, and potentially allow the existing building to remain open while the addition is under construction. 

When pursuing a vertical addition of any type, using any materials, there are considerations related to design, code compliance, and construction logistics. Will the addition be considered a separate building? Does the existing building have adequate fire-resistance protection relative to the added size and number of stories? Does the existing building have sprinklers and, if not, can they be added? Does the addition add enough weight to require a new lateral analysis, foundation reinforcements, or structural framing upgrades? Does the egress in the existing building account for the added occupant load from the new stories? 

This article examines the use of mass timber for vertical additions in the U.S., addressing topics such as code compliance, construction type, fire-resistance ratings (FRR), structural reinforcement, and constructability. 

Click here to read the full article.

Latest Posts

Image
29 September 2026

Timber engineering of tomorrow

An airship hangar as a blueprint for the timber engineering of tomorrow: it is the gates that make the scale of this structure immediately comprehensible.  But the real highlight of...
Read More
Image
29 September 2026

Go the Swiss!

Bürogebäude Wood in Grenoble — The six-storey timber structure uses columns and beams spaced 4–6 m apart, supported on shallow concrete footings with tie-rods for seismic resistance; the eastern section...
Read More
Image
29 September 2026

EVE Music Hall — Croatia

This looks like an icon in the making – can’t wait to see the finished photos inside this magnificent space! The EVE Music Hall is set to become a new...
Read More
Image
29 September 2026

Albert Park Pit Building

Who doesn’t like civic buildings especially when they also serve as Grand Prix venues. Woods Bagot has been appointed to lead the architectural vision for the redevelopment of the Albert...
Read More
Image
22 September 2026

The Court Theatre – case study

The Court Theatre project is a purpose-built performing arts venue in Christchurch, designed to be the cultural heart of the city. The building integrates mass timber elements to enhance sustainability,...
Read More
Image
22 September 2026

Wood is Good Day at Te Hapara School

Hands-on Wood is Good Day gives students a glimpse into the people, technology and opportunities behind forestry. Te Hapara School students got up close to the world of forestry this...
Read More
Image
22 September 2026

Beyond the borders

When you look beyond our borders for where mass timber is gaining traction it’s often in education buildings. Maybe it’s because young people getting educated are a natural fit for...
Read More
Image
22 September 2026

Opening of Poutini Waiora

The opening of Poutini Waiora in Māwhera Greymouth celebrated a new facility designed to provide more comprehensive support for whānau and the wider West Coast community. The occasion also honoured...
Read More
Image
15 September 2026

Atlassian Central — the last panel is now in place!

The last timber panel is now in place at Atlassian Central, the final piece in a global milestone for the world’s tallest hybrid timber tower.  Also check out the great...
Read More