Image

NZ’s Timber Shortage – Help On The Way

The opening of a new wood processing plant in Rotorua in a few weeks will help alleviate New Zealand’s timber shortage, say Red Stag group CEO, Marty Verry.

The plant, says Verry, will add five percent to the capacity of the New Zealand wood processing sector. That equates to around two thousand dwelling units, or most of the estimated shortfall in current timber supply.

The factory will produce cross laminated timber, or CLT as it is commonly referred to. CLT is a new ‘mass timber’ construction product being adopted rapidly worldwide. It is made by gluing successive layers of timber laid crossways over the layer below, to form large panels of three, five or seven layers of timber thick. The rigid engineered timber panels are then precision cut by CNC machines in factory and rapidly assembled on site.

In Red Stag’s case the CLT panels can exceed 16 meters by 4 meters in size, making for very fast construction and few connections.

Kaianga Ora is a major user in New Zealand and use internationally is widespread. Google last week broke ground on its first mass timber building in Silicon Valley using CLT.

“We now have the last of the European technicians out of MIQ and doing the final commissioning of the plant. We’re going to bring forward the opening to May to help the timber shortage.”

Costing $50 million, the CLT factory is co-located with the Southern Hemisphere’s largest sawmill, Red Stag, in Rotorua. It will employ forty people initially, rising to double that over time, and is part-funded by a $15 million loan from the Provincial Growth Fund.

Verry doesn’t expect all of the CLT factory’s capacity to be used in residential units though as there is already a waiting list of other projects planning to use it, including retirement villages, student accommodation, office buildings, educational facilities and cultural buildings.

“CLT has a value sweet spot in large-format structures, buildings of three storeys or more, and for mid-floors in terraced housing built to the NZS 3604 standard. Apartment buildings and fast-to-install CLT mid-floors will be our residential focus areas.”

Supply of flooring materials such as joists, I-beams and flooring panels has had supply problems in recent months, and Verry expects the building community will be quick to take up CLT mid-floors, which drop into place to provide a finished platform to construct the next level on without delay.

Super-mill flexing

Meanwhile the CLT factory’s sister company, Red Stag Timber is also flexing to help with the timber shortage. The country’s largest sawmill, supplying around 25 percent of New Zealand’s needs, is pulling back uncommitted supply from export markets and squeezing out more hours and capacity to help keep its ITM, PlaceMakers, Mitre10 and independent clients.

“We plan to bring forward further expansion of both the mill and CLT factory on the back of Carter Holt Harvey’s decision to stop supply to key merchant chains”, adds Verry. “There are many in the industry that will want to source from an independently-owned supply chain, rather than relying on product from a competing merchant chain.”

Source: Scoop News

Latest Posts

Image
29 September 2026

Timber engineering of tomorrow

An airship hangar as a blueprint for the timber engineering of tomorrow: it is the gates that make the scale of this structure immediately comprehensible.  But the real highlight of...
Read More
Image
29 September 2026

Go the Swiss!

Bürogebäude Wood in Grenoble — The six-storey timber structure uses columns and beams spaced 4–6 m apart, supported on shallow concrete footings with tie-rods for seismic resistance; the eastern section...
Read More
Image
29 September 2026

EVE Music Hall — Croatia

This looks like an icon in the making – can’t wait to see the finished photos inside this magnificent space! The EVE Music Hall is set to become a new...
Read More
Image
29 September 2026

Albert Park Pit Building

Who doesn’t like civic buildings especially when they also serve as Grand Prix venues. Woods Bagot has been appointed to lead the architectural vision for the redevelopment of the Albert...
Read More
Image
22 September 2026

The Court Theatre – case study

The Court Theatre project is a purpose-built performing arts venue in Christchurch, designed to be the cultural heart of the city. The building integrates mass timber elements to enhance sustainability,...
Read More
Image
22 September 2026

Wood is Good Day at Te Hapara School

Hands-on Wood is Good Day gives students a glimpse into the people, technology and opportunities behind forestry. Te Hapara School students got up close to the world of forestry this...
Read More
Image
22 September 2026

Beyond the borders

When you look beyond our borders for where mass timber is gaining traction it’s often in education buildings. Maybe it’s because young people getting educated are a natural fit for...
Read More
Image
22 September 2026

Opening of Poutini Waiora

The opening of Poutini Waiora in Māwhera Greymouth celebrated a new facility designed to provide more comprehensive support for whānau and the wider West Coast community. The occasion also honoured...
Read More
Image
15 September 2026

Atlassian Central — the last panel is now in place!

The last timber panel is now in place at Atlassian Central, the final piece in a global milestone for the world’s tallest hybrid timber tower.  Also check out the great...
Read More