Image

One for the Sustainability Managers and Architects

The purpose of the Return to Form Comparative Life Cycle Assessment Study building study is to use whole building life cycle assessment (WBLCA) and cost estimating to understand the embodied carbon and dollar cost implications of choosing between functionally equivalent mass timber, steel, and concrete structural systems. It compares a mass timber reference building—Return to Form, located in Denver, Colorado—to alternatives designed in cold-formed steel (CFS) and concrete. Comparisons between the three systems are made in terms of embodied carbon, construction dollar cost, and speed of construction. The variations between architectural designs (construction type, enclosures, fire protection, acoustic performance, and ceiling finishes) are included in the analyses.

The Return to Form building study is intended to be read together with the Mass Timber Comparative Life Cycle Assessment Series Introduction, which details aspects common to all studies in the series, including methodology, approach, scope, and code compliance of the comparative designs, life cycle assessment (LCA) and dollar cost analyses, and the importance of embodied carbon and biogenic carbon as part of the building industry’s strategy to address climate change and environmental degradation. This study details information specific to Return to Form and any variations from the series introduction.

Click here to download the study.

Latest Posts

Image
29 September 2026

Timber engineering of tomorrow

An airship hangar as a blueprint for the timber engineering of tomorrow: it is the gates that make the scale of this structure immediately comprehensible.  But the real highlight of...
Read More
Image
29 September 2026

Go the Swiss!

Bürogebäude Wood in Grenoble — The six-storey timber structure uses columns and beams spaced 4–6 m apart, supported on shallow concrete footings with tie-rods for seismic resistance; the eastern section...
Read More
Image
29 September 2026

EVE Music Hall — Croatia

This looks like an icon in the making – can’t wait to see the finished photos inside this magnificent space! The EVE Music Hall is set to become a new...
Read More
Image
29 September 2026

Albert Park Pit Building

Who doesn’t like civic buildings especially when they also serve as Grand Prix venues. Woods Bagot has been appointed to lead the architectural vision for the redevelopment of the Albert...
Read More
Image
22 September 2026

The Court Theatre – case study

The Court Theatre project is a purpose-built performing arts venue in Christchurch, designed to be the cultural heart of the city. The building integrates mass timber elements to enhance sustainability,...
Read More
Image
22 September 2026

Wood is Good Day at Te Hapara School

Hands-on Wood is Good Day gives students a glimpse into the people, technology and opportunities behind forestry. Te Hapara School students got up close to the world of forestry this...
Read More
Image
22 September 2026

Beyond the borders

When you look beyond our borders for where mass timber is gaining traction it’s often in education buildings. Maybe it’s because young people getting educated are a natural fit for...
Read More
Image
22 September 2026

Opening of Poutini Waiora

The opening of Poutini Waiora in Māwhera Greymouth celebrated a new facility designed to provide more comprehensive support for whānau and the wider West Coast community. The occasion also honoured...
Read More
Image
15 September 2026

Atlassian Central — the last panel is now in place!

The last timber panel is now in place at Atlassian Central, the final piece in a global milestone for the world’s tallest hybrid timber tower.  Also check out the great...
Read More