Image

Reimagining New Zealand’s Government Precinct with Safe, Modern Accommodation

The New Zealand Parliamentary Buildings Project, as part of the Future Accommodation Strategy, represents a significant update of Aotearoa New Zealand’s parliamentary infrastructure. Funded through the 2022 Budget, this initiative aims to construct new buildings that provide safe, modern, and sustainable accommodation for Members of Parliament, and staff.

The project not only addresses Parliament’s current and future space needs, but also reflects New Zealand’s rich cultural heritage while advancing climate-conscious goals. 

Responding to growth: The drivers behind the project 

As New Zealand’s population and Parliament have expanded over the past 30 years, the need for modern, fit-for-purpose facilities has become increasingly apparent with Parliament’s occupancy having long outgrown the existing office accommodation on precinct. Members of Parliament and staff have, since the 1990s, been spread across multiple leased buildings with the existing options being inefficient, costly, and lacking resilience.

Aurecon was engaged to deliver a solution that consolidates parliamentary functions within Crown-owned buildings, reducing dependency on leased office accommodation and creating a more secure and resilient environment.

The project is also designed to prioritise flexible spaces to support the changing needs of each Government following each election and over time, all while enhancing safety, cultural inclusivity and supporting a low-carbon Parliament for the coming decades.

Click here to read more.

Latest Posts

Image
3 November 2026

Prolam SED PLX Portal test

Farhad walks through our recent live structural test at Prolab, Prolam’s in-house testing facility, explaining the system, the test setup and what we learned. The test put our latest composite...
Read More
Image
3 November 2026

The Hive

If you work in mass timber – or drive around Vancouver – you’ve probably seen The Hive by now. So rather than introducing the project again, here is one pretty...
Read More
Image
3 November 2026

Wharerama pod

Sheppard & Rout designed this amazing place of healing at St Thomas College! Incredible inspiring vision from the Gibbons family, beautifully built by Armitage Williams with help from Naylor Love...
Read More
Image
27 October 2026

SPEC Toolbox 3.0

Just released — SPEC Toolbox 3.0, the biggest release since we started as CLT Toolbox. Thousands of structural engineers use the platform to design mass timber, free, with real supplier...
Read More
Image
27 October 2026

Te Ao Mārama Tauranga Library and Community Hub

Recently, Te Ao Mārama Tauranga Library and Community Hub officially opened its doors to the public, marking an exciting milestone as the first building within the Te Manawataki o Te...
Read More
Image
27 October 2026

Mass Timber Diaphragms for Tall Buildings

Practical Design Guidance for Tall Timber and Hybrid Buildings As building codes continue to enable taller mass timber construction across Canada, engineers and designers are seeking practical approaches to designing...
Read More
Image
27 October 2026

Henryk Arctowski Antarctic Station uses timber prefabrication

Harsh weather, limited operational windows and complex logistics: how timber prefabrication and teamwork made the new Polish Henryk Arctowski Antarctic Station possible. How far can timber prefabrication go? All the...
Read More
Image
3 November 2026

Fast & Epp’s concept lab introduces Glulam CLT (GCLT)

Have you ever felt the face-grain expression of softwood CLT lacks the refined look of an edge grain profile? Ever wanted sharper kerf edges or acoustic attenuation in a CLT...
Read More
Image
20 October 2026

Moisture management of mass timber buildings

CWC Handbook for Construction Moisture Management of Mass Timber Buildings Moisture management doesn’t begin when rain appears in the forecast. It begins during project planning and continues through construction, commissioning,...
Read More