Image

The Living House

12 August 2025

The Living House was designed by RTA Studio Ltd to address three crises New Zealand is currently facing.

Living House is a practical response to these complex challenges. The goal was to prove that high-quality, climate positive, architect-designed housing can also be affordable.

Living House rethinks how homes are delivered, replacing bespoke builds with a standardised product that removes unnecessary cost, waste and complexity.

In March, the first Living House was built in six weeks in Rototua. Those who have visited have all acknowledged that they feel like they are walking into a calm, safe space that connects with nature.

“It feels instantly familiar – like you’re home”.

Learn more about the Living House by viewing the video, narrated by architect Rich Naish.

Click here to read the original LinkedIn post and view the video narrated by architect Rich Naish.

Click here to read more about the Living House.

WoodWorks Issue – 12 Aug 2025

Welcome

Greetings from your WoodWorks team. First up we celebrate with the team responsible for the project at 90 Devonport Road, Tauranga. The project has won an award recognising the build-ability of the structural design and excellent teamwork among other things. Our second story is from Rotorua where Richard Naish and the team from RTA Studio have built an architecturally designed, light filled 3 bedroom home in 6 weeks for $335,000.

Next up, CLT Toolbox has a generous announcement for students and educators who are now able to access the professional level software for free until 30 June 2026. From Canada, British Columbia will be opening a net-zero carbon hospital in 2027 which will be environmentally and financially cost effective to run.

Freres Wood in Oregon, USA has expanded the range of wood finishes available in mass timber, observe the inspiringly dramatic darkness of the charred finish. To finish up this week we have included a couple of jokes.

Remember to peruse the programme for our national WoodWorks Conference running 4-5 November. We anticipate a productive couple of days in Rotorua.

Editor's Signature
Image
12 August 2025

90 Devonport Road in Tauranga Receives Prestigious Award

The 90 Devonport Road project in Tauranga has received the prestigious Building Award at the 2025 SESOC – Structural Engineering Society New Zealand (SESOC) Awards. Congratulations to the team at...
Read More
Image
12 August 2025

The Living House

The Living House was designed by RTA Studio Ltd to address three crises New Zealand is currently facing. Living House is a practical response to these complex challenges. The goal...
Read More
Image
12 August 2025

Let’s Empower the Next Generation of Engineers

In a landmark move to accelerate the future of sustainable construction, CLT Toolbox announced an unprecedented global education initiative. Effective immediately until June 30, 2026, they are making their complete,...
Read More
Image
12 August 2025

Canada’s first Net-Zero Carbon Hospital set to open in 2027

The new Cowichan District Hospital (CDH) Replacement Project — scheduled to open in 2027 — the future CDH will be the first hospital in Canada to achieve Zero Carbon Building...
Read More
Image
12 August 2025

Strength or Beauty?

What is the attraction of mass timber for commercial buildings or multi-residential developments? How it looks or how it performs as a structure? What do architects think about the ‘look’...
Read More
Image
12 August 2025

A Little Light Humour

A six year old goes to the hospital with her grandmother to visit her Grandpa. When they get to the hospital, she runs ahead of her Grandma and bursts into...
Read More