Image

This will be the largest CLT affordable housing complex in the Netherlands

Rotterdam-based architecture office Powerhouse Company has unveiled designs for Valckensteyn, a circular and sustainable building expected to become the largest timber-built affordable housing complex in the Netherlands. Commissioned by housing corporation Woonstad Rotterdam, the pioneering, 12-story project will feature 11 stories built of cross-laminated timber without the use of adhesives to allow the building to be demounted and reassembled elsewhere as needed.

Proposed for the post-war Rotterdam neighborhood of Pendrecht, the 40-meter-tall Valckensteyn will occupy the site of a residential complex that was demolished a decade ago. Due to Valckensteyn’s relatively lightweight timber build as compared to steel-and-concrete construction, the architects will be able to repurpose the old building’s foundations — a sustainable design decision that helps to significantly reduce the project’s carbon footprint.

For stability, the affordable housing complex will comprise a concrete ground floor and core. The ground-floor lobby will be clad in travertine — a post-war material with strong ties to the neighborhood — and house a large, inviting space with what the architects hope will be “the most beautiful bicycle storage in Rotterdam.” Cross-laminated timber construction will be exposed in the above floors, where all 82 homes will enjoy connections to the outdoors via floor-to-ceiling windows and timber-clad, west-facing balconies. A lush landscaping plan designed by LAP Landscape & Urban Design will surround the building and stimulate biodiversity. The carpark will also integrate cement-free paving stones and water filtration systems to take on the appearance of a “green carpet.”

“With project Valckensteyn, Woonstad set out the challenge to develop a responsible and sustainable housing supply for middle-income families,” said Robbert Groeneveld, senior project manager at Woonstad Rotterdam. “The desire of Woonstad for a wooden building has been developed into an integrated design where sustainability, housing comfort and nature inclusivity come together.” Construction on Valckensteyn is expected to start in January 2022.

Read More >>

Source: InHabitat

Latest Posts

Image
29 September 2026

Timber engineering of tomorrow

An airship hangar as a blueprint for the timber engineering of tomorrow: it is the gates that make the scale of this structure immediately comprehensible.  But the real highlight of...
Read More
Image
29 September 2026

Go the Swiss!

Bürogebäude Wood in Grenoble — The six-storey timber structure uses columns and beams spaced 4–6 m apart, supported on shallow concrete footings with tie-rods for seismic resistance; the eastern section...
Read More
Image
29 September 2026

EVE Music Hall — Croatia

This looks like an icon in the making – can’t wait to see the finished photos inside this magnificent space! The EVE Music Hall is set to become a new...
Read More
Image
29 September 2026

Albert Park Pit Building

Who doesn’t like civic buildings especially when they also serve as Grand Prix venues. Woods Bagot has been appointed to lead the architectural vision for the redevelopment of the Albert...
Read More
Image
22 September 2026

The Court Theatre – case study

The Court Theatre project is a purpose-built performing arts venue in Christchurch, designed to be the cultural heart of the city. The building integrates mass timber elements to enhance sustainability,...
Read More
Image
22 September 2026

Wood is Good Day at Te Hapara School

Hands-on Wood is Good Day gives students a glimpse into the people, technology and opportunities behind forestry. Te Hapara School students got up close to the world of forestry this...
Read More
Image
22 September 2026

Beyond the borders

When you look beyond our borders for where mass timber is gaining traction it’s often in education buildings. Maybe it’s because young people getting educated are a natural fit for...
Read More
Image
22 September 2026

Opening of Poutini Waiora

The opening of Poutini Waiora in Māwhera Greymouth celebrated a new facility designed to provide more comprehensive support for whānau and the wider West Coast community. The occasion also honoured...
Read More
Image
15 September 2026

Atlassian Central — the last panel is now in place!

The last timber panel is now in place at Atlassian Central, the final piece in a global milestone for the world’s tallest hybrid timber tower.  Also check out the great...
Read More