Image

Timberview VIII: Portland’s Mass Timber Affordable Housing Takes Charge

Timberview VIII, a newly completed mass timber eight-story mixed-use development in Northeast Portland, is making headlines as a model for affordable housing and sustainable construction.

At the bustling intersection of Northeast 99th Avenue and Glisan Street in Portland, Oregon, rises Timberview VIII, an innovative eight-story mixed-use structure pushing the boundaries of affordable housing solutions through its groundbreaking utilization of mass timber. The building is a testament to the collaborative efforts of visionaries like Curtis Rystadt, the lead developer from C & J Property Development LLC, and the expertise of firms like Access Architecture, DCI Engineers, and Truebeck Construction.

A Sustainable Solution for a Pressing Need

Timberview VIII is not just another apartment building. It represents a paradigm shift in addressing Portland’s critical need for affordable housing while simultaneously championing sustainable construction practices. With 105 units available at 60% of the Area Median Income, the project offers studio, one-, two-, and three-bedroom units, with rent ranging from approximately $1,100 to $1,700 per month. This affordability is crucial in a city grappling with a housing deficit projected to require over 120,000 new units in the next two decades, with more than half designated as affordable housing.

The choice of mass timber as the primary building material aligns perfectly with the project’s sustainability goals. Curtis Rystadt, reflecting on his decision to embrace mass timber, stated, “This cause helps the environment. This cause helps people who need affordable housing. How is that not a great investment in our society?” Mass timber, unlike its traditional counterparts, concrete and steel, sequesters carbon, serving as a natural carbon sink. 

Click here to read more.

Latest Posts

Image
3 November 2026

Prolam SED PLX Portal test

Farhad walks through our recent live structural test at Prolab, Prolam’s in-house testing facility, explaining the system, the test setup and what we learned. The test put our latest composite...
Read More
Image
3 November 2026

The Hive

If you work in mass timber – or drive around Vancouver – you’ve probably seen The Hive by now. So rather than introducing the project again, here is one pretty...
Read More
Image
3 November 2026

Wharerama pod

Sheppard & Rout designed this amazing place of healing at St Thomas College! Incredible inspiring vision from the Gibbons family, beautifully built by Armitage Williams with help from Naylor Love...
Read More
Image
27 October 2026

SPEC Toolbox 3.0

Just released — SPEC Toolbox 3.0, the biggest release since we started as CLT Toolbox. Thousands of structural engineers use the platform to design mass timber, free, with real supplier...
Read More
Image
27 October 2026

Te Ao Mārama Tauranga Library and Community Hub

Recently, Te Ao Mārama Tauranga Library and Community Hub officially opened its doors to the public, marking an exciting milestone as the first building within the Te Manawataki o Te...
Read More
Image
27 October 2026

Mass Timber Diaphragms for Tall Buildings

Practical Design Guidance for Tall Timber and Hybrid Buildings As building codes continue to enable taller mass timber construction across Canada, engineers and designers are seeking practical approaches to designing...
Read More
Image
27 October 2026

Henryk Arctowski Antarctic Station uses timber prefabrication

Harsh weather, limited operational windows and complex logistics: how timber prefabrication and teamwork made the new Polish Henryk Arctowski Antarctic Station possible. How far can timber prefabrication go? All the...
Read More
Image
3 November 2026

Fast & Epp’s concept lab introduces Glulam CLT (GCLT)

Have you ever felt the face-grain expression of softwood CLT lacks the refined look of an edge grain profile? Ever wanted sharper kerf edges or acoustic attenuation in a CLT...
Read More
Image
20 October 2026

Moisture management of mass timber buildings

CWC Handbook for Construction Moisture Management of Mass Timber Buildings Moisture management doesn’t begin when rain appears in the forecast. It begins during project planning and continues through construction, commissioning,...
Read More