Image

Toronto: New Beam Design for 10-Storey College Building

Limberlost Place, George Brown College – A slab banded structure: The winner of an international design competition, the $150M Limberlost Place will be a 10-storey, 16,250 square-meter, exposed tall wood structure located on George Brown College’s waterfront campus in Toronto. The project will serve as an educational hub for George Brown College, housing a Tall Wood Research Institute and a childcare centre in addition to a significant amount of teaching and social spaces.

Working in collaboration with Moriyama & Teshima Architects and Acton Ostry Architects, Fast + Epp developed an innovative large span beamless structural system that is comprised of timber-concrete-composite CLT slab bands with perpendicular CLT infill panels, all supported on glulam columns. This long span flat plate system allows for flexibility in architectural programming and unobstructed mechanical distribution.

Click here to read more.

Latest Posts

Image
3 November 2026

Prolam SED PLX Portal test

Farhad walks through our recent live structural test at Prolab, Prolam’s in-house testing facility, explaining the system, the test setup and what we learned. The test put our latest composite...
Read More
Image
3 November 2026

The Hive

If you work in mass timber – or drive around Vancouver – you’ve probably seen The Hive by now. So rather than introducing the project again, here is one pretty...
Read More
Image
3 November 2026

Wharerama pod

Sheppard & Rout designed this amazing place of healing at St Thomas College! Incredible inspiring vision from the Gibbons family, beautifully built by Armitage Williams with help from Naylor Love...
Read More
Image
27 October 2026

SPEC Toolbox 3.0

Just released — SPEC Toolbox 3.0, the biggest release since we started as CLT Toolbox. Thousands of structural engineers use the platform to design mass timber, free, with real supplier...
Read More
Image
27 October 2026

Te Ao Mārama Tauranga Library and Community Hub

Recently, Te Ao Mārama Tauranga Library and Community Hub officially opened its doors to the public, marking an exciting milestone as the first building within the Te Manawataki o Te...
Read More
Image
27 October 2026

Mass Timber Diaphragms for Tall Buildings

Practical Design Guidance for Tall Timber and Hybrid Buildings As building codes continue to enable taller mass timber construction across Canada, engineers and designers are seeking practical approaches to designing...
Read More
Image
27 October 2026

Henryk Arctowski Antarctic Station uses timber prefabrication

Harsh weather, limited operational windows and complex logistics: how timber prefabrication and teamwork made the new Polish Henryk Arctowski Antarctic Station possible. How far can timber prefabrication go? All the...
Read More
Image
3 November 2026

Fast & Epp’s concept lab introduces Glulam CLT (GCLT)

Have you ever felt the face-grain expression of softwood CLT lacks the refined look of an edge grain profile? Ever wanted sharper kerf edges or acoustic attenuation in a CLT...
Read More
Image
20 October 2026

Moisture management of mass timber buildings

CWC Handbook for Construction Moisture Management of Mass Timber Buildings Moisture management doesn’t begin when rain appears in the forecast. It begins during project planning and continues through construction, commissioning,...
Read More