Vittorio Salvadori: I am currently updating my doctoral research for a new article to be published soon, and I have collected 5 projects:
1) Arboretum (France-2023): 125,000 m2
2) Siemens Campus Erlangen (Germany-2022): 75,000 m2
3) Origine (France-2020): 70,000 m2
4) Arbora (Canada-2017): 55,515 m2
5) Sue&til (Switzerland-2018): 53,000 m2
Altogether, these projects amount to an impressive 380,000 m2 of building area. They are all timber-hybrid post-and-beam structures, with mass timber elements combined with concrete (cores, podiums, or slab layers) and/or steel.
The first three projects have been added to my original PhD list, proving two things:
1) the size of timber (hybrid) projects is growing very rapidly;
2) construction companies are getting used to handling such large projects made of mass timber.
I am very curious to see how the list will change in a couple of years.
Click here for source.
Latest Posts

Prolam SED PLX Portal test

The Hive

Wharerama pod

SPEC Toolbox 3.0

Te Ao Mārama Tauranga Library and Community Hub

Mass Timber Diaphragms for Tall Buildings

Henryk Arctowski Antarctic Station uses timber prefabrication

Fast & Epp’s concept lab introduces Glulam CLT (GCLT)