Vittorio Salvadori: I am currently updating my doctoral research for a new article to be published soon, and I have collected 5 projects:
1) Arboretum (France-2023): 125,000 m2
2) Siemens Campus Erlangen (Germany-2022): 75,000 m2
3) Origine (France-2020): 70,000 m2
4) Arbora (Canada-2017): 55,515 m2
5) Sue&til (Switzerland-2018): 53,000 m2
Altogether, these projects amount to an impressive 380,000 m2 of building area. They are all timber-hybrid post-and-beam structures, with mass timber elements combined with concrete (cores, podiums, or slab layers) and/or steel.
The first three projects have been added to my original PhD list, proving two things:
1) the size of timber (hybrid) projects is growing very rapidly;
2) construction companies are getting used to handling such large projects made of mass timber.
I am very curious to see how the list will change in a couple of years.
Click here for source.
Latest Posts

Timber engineering of tomorrow

Go the Swiss!

EVE Music Hall — Croatia

Albert Park Pit Building

The Court Theatre – case study

Wood is Good Day at Te Hapara School

Beyond the borders

Opening of Poutini Waiora