Stage 2 of the timber superstructure has commenced and is rocketing up.
The Leighs Construction Ltd team have installed the final double-height columns and are making progress on the level 3 floor crosslam.
Installation of the Stora Enso Sylva stairs has started. There are two stair sets, a rear egress stair and a main feature stair that will be lowered through the full height open atrium following the structural top-out.
King Facade International are well into the installation of the curtainwall, with most of Manchester Street completed. On this west façade every third unit is a GRC “flick” that is not just form but also provides an important function when it comes to building operational efficiency.
The south wall fire rated cladding was installed over just 3 days thanks to Wayman Roofing Services Ltd.
The Equus warm roof install has kicked off. This roof provides the building with a R12 highly insulated roof, another significant component to the high operational efficiency.
Click here to read the original LinkedIn post by Jono Skinner of Portus Property



WoodWorks Issue – 03 Jun 2025
Welcome
Greetings for another Tuesday mass timber update. We’re delighted to say there are only a few seats left for our Christchurch seminar and site visit. Click here to register now!
We’re keen to showcase more mass timber building projects around the regions. If you know of a mass timber project under construction and the project team is happy to host a group, please call and we’ll see if we make it work.
Thanks to those of you’ve offered presentations for our national conference on 4-5 November. We’ve already received a good mix of case study offers and can take 3-4 more if you’re keen.
With the building costs and tight Government budgets making New Zealand’s planned hospital builds more challenging, do you think there is a place for lobbying to build parts of these new assets with exposed mass timber, as biophilic environments are proven to speed recoveries. How do we do it; got any suggestions? Is there a role for a group of AEC leaders who can make a case for using more mass timber in health facilities?


211 High Street

Construction wraps up at Khupkhahpay’ay in Vancouver

Case study: Wood insulation