
DigiBuild™ – New service ALERT
…well, we’ve been offering this for a while, but we want to give this ‘string to our bow’ a more distinct profile.
Our DigiBuild™ service is ideally suited for builders of custom homes or projects to work through a given design pre-construction and deal with any issues (manufacture and buildability) before materials arrive on site.
Expect a faster and smoother build. Reduced risk and less headaches.
As always, our models are fab-ready and machine readable by your timber fabricator, means increased efficiencies due to less shop drawing.
Find out more online (www.digibuild.nz) or talk to us.
Latest Posts

13 October 2026
Beyond the drawing board: the practical questions around mass timber
As engineered timber becomes more widely used across Australasia, the industry’s focus is shifting from design possibilities to the harder realities of procurement, cost certainty and getting projects built. The...

13 October 2026
Rethinking townhouse construction with engineered timber
Townhouses are fast closing the gap with standalone houses in New Zealand’s new-build market. According to Stats NZ, 17,230 townhouses, flats and units were consented in the year to May...

13 October 2026
University of Toronto wood tower
Pomerleau is delivering preconstruction, value engineering, design-assist, and construction services for the University of Toronto Academic Wood Tower, a 14-storey, 77-metre hybrid steel-and-timber building set to become Canada’s tallest mass...

13 October 2026
Build together, belong together
Centrumeiland, a reclaimed residential island east of Amsterdam and part of the IJburg expansion, includes social housing built with timber structures and reclaimed-wood façades. Many plots were reserved for private...

6 October 2026
Building a timber trampoline in the sky!
The Pringle at Assembly Studios near Atlanta is an 82-foot clear-span, 4,000-square-foot bending-active timber gridshell. Its two-layer roof was assembled flat from straight 3-by-3-inch timber laths, lifted in a single...

6 October 2026
Mass timber solution to Canada’s housing crisis
New study from Perkins&Will offers mass timber solution to Canada’s housing crisis — researchers propose a prefabricated, modular mass-timber system for accelerating housing delivery while supporting the nation’s economy and...

6 October 2026
Waikato Regional Theatre case study
The Waikato Regional Theatre is an arts-led regeneration project intended to create a civic and cultural hub on Hamilton’s riverfront. Designed as a community and visitor destination, it will combine...

29 September 2026
Timber engineering of tomorrow
An airship hangar as a blueprint for the timber engineering of tomorrow: it is the gates that make the scale of this structure immediately comprehensible. But the real highlight of...

29 September 2026
Go the Swiss!
Bürogebäude Wood in Grenoble — The six-storey timber structure uses columns and beams spaced 4–6 m apart, supported on shallow concrete footings with tie-rods for seismic resistance; the eastern section...
